• Successfully installed 4 nos x 550m HDPE pipes for OWF Project in Taiwan   • Successfully installed India's longest Intersection HDD: 6-inch steel pipe x 3558m at Brahmaputra River for Gail India Ltd   • Successfully installed under hard rock conditions 18"+6" x 2523m at Vashi Creek Navi Mumbai for BPCL   • Successfully installed 12+6-inch steel pipe x 3200m at Mahanadi River for Gail India Ltd

Trenchless Services

Services
1
WE ARE THE LEADERS IN THE
CONSTRUCTION INDUSTRY!

The leadership team at TESPL is vastly experienced and has many executives who have more than 25 years of experience in the HDD industry across all terrains like soft & hard rock, silt and swampy conditions, across railways, rivers, canals and highways. They have also worked in difficult rocky & gravel conditions at many locations. 

Horizontal Directional
Drilling

We have a strong international presence, we have successfully completed H.D.D. projects in various countries of Asia and Pacific.

Shore
Approaches

In all, the principals and employees of TRENCHLESS ENGINEERING (P) LTD have executed in over 200 river crossings just of Oil and Gas sector and Hydro testing.

Micro
Tunnelling

We have a strong international presence, we have successfully completed H.D.D. projects in various countries of Asia and Pacific.

HDD Drilling
Crew

We provide professional ‘HDD drilling crew services’ for clients across the world from small to large crossings up to 3000 meters in length in Soft and Hard rock,Sandy & Swampy .

AUGER BORING
BOX PUSHING
Auger Boring Machine is used to bore horizontally through soil or rock with a cutting head and auger. The majority of Auger Boring are used to install pipe casing under railroads, highway etc…
pipe
thruster

This pipe thruster is a result of dedication R&D effort of our in-house research. It is designed, engineered and fabricated at CWS. The pipe thruster is opwered by 500 HP hydraulic power unit.