• Successfully installed 4 nos x 550m HDPE pipes for OWF Project in Taiwan   • Successfully installed India's longest Intersection HDD: 6-inch steel pipe x 3558m at Brahmaputra River for Gail India Ltd   • Successfully installed under hard rock conditions 18"+6" x 2523m at Vashi Creek Navi Mumbai for BPCL   • Successfully installed 12+6-inch steel pipe x 3200m at Mahanadi River for Gail India Ltd

Our Top 8 Crossings

OUR TOP 8 CROSSINGS

Yamuna River
36” + 6”
2000m
Ganga
24” + 6″
2320m
Narmada River
30” + 6”
2015m
Ramganga River
24” + 6”
2200m
Maner River
18” + 6″
2530m
taichung LNG  terminal
36” + 6”
1750m
chambal River
16” + 6”
1400m
VASHI CREEK
18″ + 6″
2524 M